0
1

Scaffold Tag Kits


£11.39 Inc VAT (20%)

See 2 Product Variants
£11.39

Description

All scaffold structures must be inspected under the following conditions:

- After the initial erection.
- Following any exposure to weather that could affect strength or stability.
- Following any substantial alteration/changes.
- At regular intervals (not exceeding 7 days from previous inspection).

Feature Attributes

Type:
Scaffold

We suggest upgrading to Chrome

to enjoy all the features of this site.
Please download the latest version of Chrome